摘要
石油化工工艺管道安装往往会遇到各种问题,如:环境问题、工程地点情况问题、材料方面问题、工程施工要求问题等等,这些问题对于实际的经验要求比较高,书面上的一些资料以及工程的设计要点难以解决安装中的问题。而如果安装中出现了一些问题,这些问题又不能得到及时的解决,那么工程的质量就难以得到保障,为今后的工程埋下隐患,因此,我们要对工程施工的过程进行严格的管理和监控,争取将工程的每个项目环节做到高效高质的完成。本文将根据工程的实际情况,将常见的问题综合一下并提出解决的办法,对石油化工管道的安装工程进行合理的分析。
The installation of petrochemical pipelines will encounter various problems,such as issues of environment,the situation of project site,materials,construction requirements,etc.,these issues have relatively high requirements for the practical experience,some of the writing information and engineering design points are difficult to solve the installation problems.When encountered the problems,it can not get resolved timely,quality of the projects would be difficult to be safeguarded,laying hidden dangers.So,we have to carry out strict management and monitoring on the process of construction and strive to projects' each item links to achieve high quality and efficient completion.Based on the actual situation of the project,solutions were proposed aiming at common problems,and installation of petrochemical pipelines was analyzed rationally.
出处
《价值工程》
2012年第15期78-79,共2页
Value Engineering
关键词
石油化工管道安装
施工问题
质量控制
installation of petroleum chemical pipe
construction problems
quality control