期刊文献+

工作面推进方向对坡体采动裂缝影响的数值模拟 被引量:9

Numerical Simulation on the Influence of Working Face Advancing Direction on Fracture Caused by Slope Mining
原文传递
导出
摘要 山体采动裂缝是诱发坡体滑坡的重要因素。通过UDEC数值模拟分析了工作面上坡和下坡开采产生山体裂缝的差异,结果表明:工作面上坡开采时下半坡体和坡脚受采动附加应力作用很难形成较大的裂缝,下坡开采时坡顶、坡体中部更容易产生较大裂缝;上坡开采形成牵引型正裂缝,下坡开采形成推动型逆裂缝;上坡开采超前裂缝距离大于上坡开采。 Fracture caused by mining in mountain is the major influencing factor of inducing slope landslides.The paper studied the difference of fracture during upslope mining and downslope mining at working face with the UDEC numerical simulation.The research shows that the fractures under additional stress action are difficult to formed on lower parts and toe of slope during upslope mining,and they are easy to formed on the top and central of slope during downslope mining;the tractional normal fractures are formed during upslope mining,and promoted reverse fractures are formed during downslope mining;the distance of the advance fracture during upslope mining is greater than that during downslope mining.
出处 《煤矿安全》 CAS 北大核心 2012年第5期150-153,共4页 Safety in Coal Mines
关键词 推进方向 坡体 采动裂缝 滑坡 advance direction slope body fracture caused by slope mining slope landslides
  • 相关文献

参考文献2

二级参考文献17

共引文献94

同被引文献140

引证文献9

二级引证文献89

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部