期刊文献+

风电热开始降温

Wind electric start cooling
下载PDF
导出
摘要 2012年,温总理所做《政府工作报告》中主要任务的第四部分,其表述为“促进产业结构优化升级。推动战略性新兴产业健康发展。建立促进新能源利用的机制,加强统筹规划、项目配套、政策引导,扩大国内需求,制止太阳能、风电等产业盲目扩张”。 Different with the last 9 years,the government report of 2012 suddenly proposed to limit the development of renewable energy,including wind energy. This means the sustained warming trend of wind power for five consecutive years since 2005 may turn cooling in this year. The generation of wind power in 2010 amounted to 50.1 billion kwh on a growth rate of 81.41%,while wind power generation in 2011 is about 70.6 billion kwh with an increase of only 40%. This sharply decline is associated with limited power.in the past year,the grid has made a lot of work.Compared to the rapid construction speed of wind farms,the period of inter-provincial and inter-regional grid construction is clearly much slower. Since 2005,China's wind power industry is developing fastly.However, hidden security risks are constantly accumulated.There is a total of 193 windy power off accidents from January in 2011 to August.It shows the lack of domestic wind farm grid standards and technology lags.Since then,the state has prosposed some relevant technical norms and standard.Meanwhile,the National Energy Board issued files to curb the blind expansion of wind power project. In the future,we could develop the smart grid and power companies should explore the intelligent power generation.
作者 锡士
出处 《上海经济》 2012年第5期44-47,6,共4页 Shanghai Economy

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部