摘要
通过对两个引水工程线路的比较、两种一级取水泵站方案的比较和三种管材的比较,选择了合理的工程实施方案。工程的实施可以使沁水县的缺水现状得到根本性的解决。
By means of comparing two schemes of water diversion line,two schemes of pumping station,and three pressure conduit schemes to deliver water from Zhangfeng Reservoir for Qinshui County,the reasonable project schemes are selected.After implementation of these schemes,the water shortage status que of Qinshui County may be changed fundamentally.
出处
《山西水利科技》
2012年第2期59-61,共3页
Shanxi Hydrotechnics
关键词
线路比较
泵站提水方案
球墨铸铁管
comparison of water-delivering line
scheme of pumping station
nodular cast iron conduit