期刊文献+

Numerical simulation on the risk of roof water inrush in Wuyang Coal Mine 被引量:11

Numerical simulation on the risk of roof water inrush in Wuyang Coal Mine
下载PDF
导出
摘要 Water-inrush in mine is one of the mine disasters caused by mining.In order to assess the risk of roof water-inrush in Wuyang Coal Mine based on the geological material of the coal mine,we built numerical models for the roof fracture and seepage development rule by using RFPA2D and COMSOL respectively,to analyze the changes in fracture zone,stress,water pressure and seepage vector with the advancement of working face,and compared the results with the field investigated data.The numerical simulation results indicate that:(1) with the advancement of the working faces,the stress relief range and fracture zone in the overlying strata increased rapidly up to about 90 m,and then tended to remain constant,reaching a final height of about 95 m which agrees with the field investigation;(2) the seepage flow constantly increased with a larger flow volume both in the front and rear area,where the stress concentration are the most serious. Water-inrush in mine is one of the mine disasters caused by mining. In order to assess the risk of roof water-inrush in Wuyang Coal Mine based on the geological material of the coal mine, we built numerical models for the roof fracture and seepage development rule by using RFPA2D and COMSOL respectively, to analyze the changes in fracture zone, stress, water pressure and seepage vector with the advancement of working face, and compared the results with the field investigated data. The numerical simulation results indicate that: (1) with the advancement of the working faces, the stress relief range and fracture zone in the overlying strata increased rapidly up to about 90 m, and then tended to remain constant, reaching a final height of about 95 m which agrees with the field investigation; (2) the seepage flow constantly increased with a larger flow volume both in the front and rear area, where the stress concentration are the most serious.
出处 《International Journal of Mining Science and Technology》 2012年第2期273-277,共5页 矿业科学技术学报(英文版)
基金 Project supports from the National Basic Research Program of China (No. 2010CB226800) the 111 Project (No. B07028) the National Natural Science Foundation of China (Nos. 50974115and 41002087)
关键词 五阳煤矿 数值模拟 顶板突水 风险 矿山灾害 矿井突水 地质材料 数值模型 Fracture zoneNumerical simulationWater inrushWuyang coal mine
  • 相关文献

参考文献13

二级参考文献102

共引文献613

同被引文献111

引证文献11

二级引证文献56

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部