摘要
以实际工程为背景,总结了平衡挂线法与传统挂线法相比具有的优点,详细阐述了平衡挂线的施工流程及施工方法,通过平衡挂线法的应用,简化了施工步骤,提高了工作效率。
Taking the actual engineering as the background, the paper summarizes the advantages of balanced thread-ligating therapy comparing to traditional thread-ligating therapy, and specifically describes the construction procedure and construction methods of balanced thread-ligating therapy. The application of balanced thread-ligating therapy simplifies the construction procedures and improves the working efficiency.
出处
《山西建筑》
2012年第17期162-163,共2页
Shanxi Architecture
关键词
导地线架设
平衡挂线
施工方法
grounding line erection, balanced thread-ligating therapy, construction method