摘要
针对高速公路、路网工程中重大工程建设项目实施过程所发生的设计变更及对工程造价的影响,分析了设计变更常见原因,指出设计监理缺失是造成工程变更的主要因素,建议尽快施行设计阶段的监理,提高工程设计水平。
In light of design change and the impact upon engineering cost of highway and network engineering in significant construction project implementation, the paper analyzes common causes of design change, and points out that the deletion of design supervision is the major factor leading to engineering change. Therefore, supervision at design phase should be implemented as soon as possible, so as to improve the engineer- ing design level.
出处
《山西建筑》
2012年第17期253-254,共2页
Shanxi Architecture
关键词
公路
设计
变更
监理
highway, design, change, supervision