LKJ数据的准确性是决定列车安全运行的基本保障,与之相应的数据检验也成为一个重要的项目;本系统采用了集成化设计,将两套便携式LKJ2000型调试装置及工业控制计算机集成在一起,在能够完成监控装置模拟的基础上,内置了工业控制计算机使之集成工作;可以在本系统上对新旧两套监控记录装置的数据进行同步运行和对比,能快速发现监控地面数据修改时的错误,对修改后的地面数据进行验证。
Accurate LKJ data is the basic guarantee of safe operation of trains,and the data validation becomes accordingly an important project.The system is designed with two sets of portable LKJ2000-type commissioning devices integrated with an industrial control computer,so it can fulfill integration work based on the implementation of the monitoring device simulation with a built-in industrial control computer.In addition,the system can fulfill synchronous operation and comparison of data of two sets of monitoring devices,and can quickly find out errors of modifying ground data and complete the validation of modified ground data.