摘要
针对武汉北货车车辆段地理情况,如何在有限的地块内设计出规模超大、功能齐全、技术先进的货车车辆段显得非常重要。本设计从用地边界条件、总图平面布置进行了设计优化,对主要生产车间的厂房组合、各生产车间的检修工艺流程进行了设计优化,提出了具体的实施方案。
North Wuhan Freight Car Depot locates at Marshalling Station in north Wuhan. As Wuhan Terminal plays a special role in the railway network, it is of great significance to design a freight car depot of super-bigness, full-featured, advanced-technology. This design optimized the land boundary conditions, general plan, plant combinations of the main pro- duction workshop and maintenance process of production workshops. Meanwhile, the paper proposed a specific implementation plan. The optimization design is innovate, and paved the way for construction of freight car depot which is professional, large-scale, intensive and modern.
出处
《武汉船舶职业技术学院学报》
2012年第2期50-51,共2页
Journal of Wuhan Institute of Shipbuilding Technology
关键词
货车车辆段
优化设计
freight car depot
optimization design