7L.H.Wu, X.Chen, X.D.Chen, Q.X.Chen. The Research on Proactive-reactive Scheduling Framework Based on Real- time Manufacturing Information [J]. Materials Science Forum, 2009(626-627): 789-794.
9H. Aytug, M. Khouja and F.E. Vergara. Use of Genetic Algorithms to Solve Production and Operations Management Problems: a Review[J]. International Journal of Production Research, 2003, 41: 3955-4009.
10G. Wan and B.P.-C. Yen. Tabu Search for Total Weighted Earliness and Tardiness Minimization on a Single Machine with Distinct Due Windows[J]. European Journal of Operational Research, 2002, 142:271-281.
8BRANDIMARTE P.Routing and scheduling in a flexible job shop by taboo search[J].Annals of Operations Research,1993,22(2):157-183.
9MATI Y,REZG N,XIE X L.An integrated greedy heuristic for a flexible job shop scheduling problem[C]//Proceedings of IEEE International Conference on Systems,Man and Cybernetics.Piscataway,N.J.,USA:IEEE,2001:2534-2539.
10HAPKE M.Pareto simulated annealing for fuzzy multi-objective combinatorial optimization[J].Journal of Heuristics,2000,6(3):329-345.