摘要
结合工程实际提出了CTCS-2级列控区段车站在站场改造工程中列控系统过渡的2种方案:一种是在CTCS-2级方式下过渡,另一种是在CTCS-0级方式下过渡,论述了两种方案的实施条件及实现方法。
In combination with the engineering practice,this paper puts forward two transition solutions of train control system for a railway station based on CTCS-2 level train control system section in station reformation,one in the CTCS-2 Level mode and another in the CTCS-0 Level mode,and discusses the implementation conditions and methods of the two solutions.
出处
《铁道通信信号》
2012年第5期17-19,共3页
Railway Signalling & Communication