1Herroelen W, Leus R. Project scheduling under uncertainty: Survey and research potentials[J]. European J of Operational Research, 2005, 165(2): 289-306.
2Chen C T, Huang S F. Applying fuzzy method for measuring criticality in project network[J]. Information Sciences, 2007, 177(12): 2448-2458.
3Chen S P, Hsueh Y J. A simple approach to fuzzy critical path analysis in project networks[J]. Applied MathematicalModelling, 2008, 32(7): 1289-1297.
4Long L D, Ohsato A. Fuzzy critical chain method for project scheduling under resource constraints and uncertainty[J]. Int J of Project Management, 2008, 26(6): 688-698.
5Leu S S, Chen A T, Yang C H. A GA-based fuzzy optimal model for construction time-cost trade-off[J]. Int J of Project Management, 2001, 19(1): 47-58.
6Chen S E Tsai M J. Time-cost trade-off analysis of project networks in fuzzy environments [J]. European J of Operational Research, 2011,212(2): 386-397.
7Ashtiani B, Leus R, Aryanezhad M B. New competitive results for the stochastic resource-constrained project scheduling problem: Exploring the benefits of pre- processing[J]. J of Scheduling, 2011, 14(2): 157-171.
8Radermacher F J. Scheduling of project networks[J]. Annals of Operations Research, 1985, 4(1): 227-252.
9Igelmund G, Radermacher E Preselective strategies for the optimization of stochastic project networks under resource constraints[J]. Networks, 1983, 13(1): 1-28.
10Igelmund G, Radermacher E Algorithmic approaches to preselective strategies for stochastic scheduling problems[J]. Networks, 1983, 13(1): 29-48.