大朝山水电站9~10号坝段横缝漏水化学灌浆处理 被引量:5

Seepage treatment for transverse joint by chemical grouting at dam sections 9~10 of Dachaoshan hydropower station
下载PDF
导出
摘要 大坝横缝渗漏处理采用骑缝化学阻渗塞法经济有效,值得推广。主要介绍大朝山水电站9~10号坝段横缝漏水化学灌浆处理的施工工艺及特点,以及LW水溶性聚氨酯灌浆材料的应用。 Chemical stopper across the joint was adopted in treatment of dam transverse joint leaking. This treatment method was economic and worthy for popularization. The paper was concerning on the construction method and character- istics of chemical grouting for transverse joint leaking at dam section 9-10 of Dachaoshan hydropower station. As well, the application of LW water-soluble polyurethane grouting material was introduced.
作者 陆志华
出处 《大坝与安全》 2012年第1期68-71,共4页 Dam & Safety
关键词 横缝渗漏处理 化学灌浆 施工工艺 大朝山电站 LW水溶性聚氨酯灌浆材料 seepage treatment of transverse joint chemical grouting construction technique Dachaoshan hydropower sta- tion LW water-soluble polyurethane
  • 相关文献

参考文献3

共引文献7

同被引文献10

引证文献5

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部