期刊文献+

Research Team on Major Upgrade Project of the Beijing Electron-Positron Collider

Research Team on Major Upgrade Project of the Beijing Electron-Positron Collider
下载PDF
导出
摘要 The research team of the CAS Institute of High Energy Physics has successfully upgraded the Beijing Electron-positron Collider (BEPC) to BEPC II, a two-ring collider with a design luminosity of 0.3-1 × 1033 cm-2s-1 which is 30 to 100 times higher than that of the one before the upgrade. During its construction lasting from 2004 to 2009, a series of innovative technological breakthroughs have been achieved. The research team of the CAS Institute of High Energy Physics has successfully upgraded the Beijing Electron-positron Collider (BEPC) to BEPC II, a tworing collider with a design luminosity of 0.3^-1 x 10^33 cm^-2s^-1 which is 30 to 100 times higher than that of the one before the upgrade. During its construction lasting from 2004 to 2009, a series of innovative technological breakthroughs have been achieved.
出处 《Bulletin of the Chinese Academy of Sciences》 2012年第2期162-163,共2页 中国科学院院刊(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部