35kV变电站改造工程验收方案一例 被引量:6

35kV变电站改造工程验收方案一例
下载PDF
导出
摘要 机电工程项目竣工验收是全面考核建设工作成果,检查工程是否符合设计要求和工程质量的重要环节,对促进建设项目及时投产、发挥投资效果,总结建设经验有重要作用。本文以东新庄35kV变电站改造工程为例,编制变电站改造工程验收方案,通过结合具体项目及竣工验收管理的特点,阐述35kV变电站改造工程竣工验收的内容、程序、依据,供同行参考指正。 Project completion and acceptance is a comprehensive assessment of construction work, check whether the works in accordance with the design requirements and project quality important link, to promote the construction project to be put into operation, play invests the effect, summarizes the construction experience has important role.Of new35kV substation reconstruction project as an example, preparation of substation project acceptance plan, through a combination of specific projects and completion acceptance management characterstic elaborated 35kV substation project completion and acceptance of the content, procedure, evidence, for reference.
作者 陆全忠
出处 《电子世界》 2012年第11期66-67,共2页 Electronics World
关键词 机电工程项目竣工验收 35kV变电站改造工程 Project completion acceptance 35kV substation renovation project
  • 相关文献

参考文献2

  • 1周步祥.电力系统远动原理及技术[J].四川大学电气信息学院.
  • 2倪维桢,高鸿翔数据通信原理[M].北京邮电大学出版社.

共引文献2

同被引文献19

引证文献6

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部