摘要
在中国建筑文化中心工程无粘结预应力双向密肋楼盖体系施工中,突破现有的建筑模壳,研制开发了新型GM03型建筑钢模壳,并结合使用早拆支撑体系,达到了预期的清水混凝土效果。
During the construction of the prestress without bond two way ribs floor system in the Chinese Architectural Culture Center, the new type GM03 building steel form shell is developed and breaks through the building form shell now available. In combination with the early removal bracing system, the desired results of fair faced concrete are achieved.
出处
《施工技术》
CAS
北大核心
2000年第3期33-34,共2页
Construction Technology
关键词
钢模壳
支撑体系
无粘结预应力
密肋楼盖
混凝土
steel form shell
bracing system
prestress without bond
rib floor
fair faced concrete
high rise building