摘要 天津津塔工程基坑支护结构采用两墙合一的地下连续墙,同时应用高压旋喷桩做止水帷幕,用GDP-22型高喷钻机实施高压喷射注浆,在土中形成具有一定强度的固结体。对不成桩,抱钻埋管,泥浆排放,堵管冻管等施工问题做了相应处理。 In Jingta Tower project of Tianjin, the support and protection structure foundation pit is a diaphragm wall integrated two wails together and high-pressure rotary jet grouting pile is used as water-stop curtain wall. GDP-22 high-pressure jet drill is adopted for high-pressure jet grouting to form a solidified structure with certain strength in soil. Some construction problems, such as pile forming failure, drill burying, slurry discharge, blocked and frozen pipeline, etc., are treated properly.
出处 《建筑技术》 2012年第6期488-490,共3页 Architecture Technology
关键词 基坑工程 地下连续墙 高压旋喷桩 foundation pit project diaphragm wall high-pressure rotary jet grouting pile
  • 相关文献

参考文献2

  • 1JGJ79-2002.建筑地基处理技术规范[S].,2002..
  • 2GB50202-2002.建筑地基基础工程施工质量验收规范[S].[S].,..

共引文献1727

同被引文献16

引证文献5

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部