狭窄场地超长钢构件吊装施工及安全监理 被引量:5

CONSTRUCTION AND SAFETY SUPERVISION FOR LIFTING OF SUPER-LONG STEEL COMPONENT ON NARROW SITE
下载PDF
导出
摘要 北京市某办公楼钢结构位于南、北楼主体结构中间连接部位的2-10层,采用塔式起重机常规吊装、双机抬吊及电动提升的安装方法。施工中制订了相应的安全监控措施,并对吊装中出现的问题及时采取对策,效果较好。 The steel structure of an office building in Beijing is located on 2F-10F floors between the main structures of north and south buildings and is installed by an integrative method of routine lifting by tower crane, uplifting by double cranes and automatic lifting. During construction, relevant safety monitoring measures are established and countermeasures for problems encountered in lifting are adopted. Favorable construction effects are obtained.
作者 寿建绍
出处 《建筑技术》 2012年第6期531-533,共3页 Architecture Technology
关键词 钢结构吊装 双机抬吊 电动提升 安全监理 steel structure lifting uplifting by double cranes automatic lifting safety supervision