摘要
介绍了新钢热连轧厂生产产能的制约瓶颈,通过对生产节奏、运输节奏的合理控制,降低粗轧区温降,最大化地满足生产,发挥产能潜力,顺利完成生产目标任务。
Constraint bottleneck of hot strip rolling production capacity is introduced in this paper,through reasonably controlling production rhythm and transport rhythm and reducing temperature drop of rough rolling,it maximizely meets production,plays potential of production capacity and completes task.
出处
《河南冶金》
2012年第2期46-48,共3页
Henan Metallurgy
关键词
生产产能
制约
温降
潜力
production capacity constraint temperature drop potential