丰满大坝全面治理工程受天气气候影响的探讨

Discussion of Influence on the Comprehensive Treatment Project of Fengman Dam by Weather and Climate
下载PDF
导出
摘要 采用统计学方法,对丰满库区附近的吉林、蛟河、桦甸三气象站1951-2010资料进行分析,探讨了目前中国运行时间最长的大型混凝土重力坝——吉林丰满水电站大坝全面治理工程所涉及的天气气候问题.重点从气温、降水、风向风速、冻土深度及短时灾害性天气和极端天气气候事件影响两大方面对重建施工和建成运行后可能出现的影响进行评价. By the statistical method,we analyzed the data of Jilin,Jiaohe and Huadian Metorological Station from 1951-2010 in this paper,which is representertive station around the Fengman Reservoir.We discussed the weather and climate concerning the comprehensive treatment project of Jilin Fengman hydroelectric station dam,which is the longest running one in China among the large scale concrete gravity dams.We focused on the temperature,precipatation,wind direction and wind speed,frozen soil depth,short–term severe weather and the extreme weather events,which may influence on processes including the Reconstruction project and after he Construction completion.
出处 《吉林师范大学学报(自然科学版)》 2012年第2期106-109,共4页 Journal of Jilin Normal University:Natural Science Edition
基金 吉林省财政厅自然科学基金课题资助
关键词 丰满大坝 重建 气候影响 Fengman dam reconstruction climate influence
  • 相关文献

参考文献4

二级参考文献43

共引文献57

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部