摘要
以南海电厂一、二期改扩建工程煤场挡风抑尘墙设计为例,针对煤场和挡风墙在不同布局条件下进行数值模拟试验并进行了结构的优化设计,从而有效的解决了煤场的粉尘污染问题,取得了良好的社会效益。
Taking the coal yard wind-proof and dust suppression wall design of phase one and two expansion project of South China Sea power plant,this paper made structure optimization design to numerical simulation test under different layout condition of coal yard and wind-proof wall,so as to effectively solve the dust pollution problems of coal yard,achieved good social benefits.
出处
《山西建筑》
2012年第16期35-36,共2页
Shanxi Architecture
关键词
挡风抑尘墙
数值模拟
结构设计
wind-proof and dust suppression wall
numerical simulation
structural design