摘要
针对水电施工项目在整个工程项目中的重要性,就建设单位对水电施工过程的质量控制进行了论述,分别从图纸会审、设备及材料质量控制、施工过程管理三方面加以说明,从而保证水电安装质量。
According to the importance of the hydropower construction program in the whole engineering program,the study indicates the quality control of the construction companies in the hydropower construction process,and indicates from the joint checkup of drawing,the quality control over equipment and materials,and management in the construction process,so as to ensure the hydropower installation quality.
出处
《山西建筑》
2012年第16期246-248,共3页
Shanxi Architecture
关键词
建设单位
水电施工
质量控制
construction companies
hydropower construction
quality control