摘要
文章以BZ13-1WHPB生活楼项目的建造方案为主线,介绍主体结构的建造流程和各阶段的基本内容,对比同类项目采用的其它建造方式,着重分析各环节设计施工的难点,以及比较不同处理方式的优缺点。
This article is based on the construction scheme of BZ13-1 WHPB Living Quarter project for main line, it describes the building process and the stages of basic content of the main structure, in contrast to the other similar projects construction program. This paper focuses on the analysis of difficulties of design and construction, and compares the advantages and disadvantages of different processing methods.
出处
《船舶标准化工程师》
2012年第3期36-39,42,共5页
Ship Standardization Engineer
关键词
海洋平台
生活楼
结构建造
offshore platform
living quarter
structure construction