哈尔滨大剧院巨型钢梁跨外吊装与厚板低温焊接技术研究 被引量:1

CONSTRUCTION TECHNIQUE ON HUGE STEEL BEAM OUT-SPAN LIFTING TECHNIQUE AND THICK PLATE LOW-TEMPERATURE WELDING TECHNIQUE IN HARBIN GRAND THEATER PROJECT
下载PDF
导出
摘要 哈尔滨大剧院巨型钢梁工程利用大型吊车、盘扣脚手架、滑移相结合的方法,圆满解决了大型构件跨外吊装的难题,特别是"小坦克"(移运器)的应用,减小了滑移时的摩擦力,使滑移工作得以顺利实施。同时采用合理的焊接工艺,解决了厚板低温焊接的技术难题,获得了非常好的效果。 During construction of huge steel beam of Harbin Grand Theater, large crane, disk-lock scaffold and slippage Especially, " construction method are jointly adopted to successfully overcome the difficulties in lifting large component shifting skates" (conveying tool) are used to reduce the friction during slippage and the slippage is smoothly carried out. Meanwhile, reasonable welding process is adopted to tackle the technical difficulties in low-temperature welding of thick plate and excellent effects are obtained.
作者 韩朋
出处 《建筑技术》 2012年第5期394-397,共4页 Architecture Technology
关键词 巨型钢梁 跨外吊装 盘扣脚手架 滑移 厚板 低温焊接 huge steel steam out--span lifting disk-lock scaffold slippage thick plate low-temperaturewelding
  • 相关文献

参考文献3

  • 1GB50205-2001.钢结构工程施工质量验收规范[S].[S].,..
  • 2JGJ81-2002.建筑钢结构焊接技术规程[s].[S].,..
  • 3陈裕川.焊接工艺评定手册[M].北京:机械工业出版社,1999:153-164.

共引文献857

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部