摘要 全面介绍大广坝水利水电枢纽工程变形监测系统的设计规模、变形监测内容、变形监测的施工情况 ,施工期观测与资料初步整理分析。据水库蓄水 1 32 m高程的资料分析结果 。 Introduced are the design,content items of monitoring,and construction details of the monitoring system,monitoring during construction and preliminary processing and analysis of the data of deformation for the Daguangba hydroelectric project. The monitoring date and deformation regularity of the dam foundation and dam body have been processed and analysed for the water level of 132 m. It is indicated that the construction quality is compatible with the design requirements.
作者 樊哲林
出处 《大坝观测与土工测试》 2000年第1期28-31,共4页 Dam Observation and Geotechnical Tests
关键词 变形 监测系统 设备安装 施工期 观测资料 deformation monitoring system installation and adjustment of equipment equipment adjustment construction period monitoring data analysis
  • 相关文献

参考文献1

共引文献4

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部