摘要
全面介绍大广坝水利水电枢纽工程变形监测系统的设计规模、变形监测内容、变形监测的施工情况 ,施工期观测与资料初步整理分析。据水库蓄水 1 32 m高程的资料分析结果 。
Introduced are the design,content items of monitoring,and construction details of the monitoring system,monitoring during construction and preliminary processing and analysis of the data of deformation for the Daguangba hydroelectric project. The monitoring date and deformation regularity of the dam foundation and dam body have been processed and analysed for the water level of 132 m. It is indicated that the construction quality is compatible with the design requirements.
出处
《大坝观测与土工测试》
2000年第1期28-31,共4页
Dam Observation and Geotechnical Tests
关键词
变形
监测系统
设备安装
施工期
观测资料
deformation
monitoring system
installation and adjustment of equipment
equipment adjustment
construction period
monitoring data analysis