试论南水北调中线干线工程建设的管理优势 被引量:4

试论南水北调中线干线工程建设的管理优势
下载PDF
导出
摘要 南水北调工程是一项关系国家战略的宏伟工程,其中线干线工程自2003年12月开工以来,在国务院南水北调办的坚强领导下,在工程沿线各级党委、政府及人民群众的大力支持下,建设单位把握工程建设管理的特点,紧紧围绕建设任务,始终坚持制度创新、技术创新、措施创新,以清晰明确的建管架构,先进务实的建管模式,严密完整的制度体系,大抓工程进度、狠抓质量安全,严抓投资控制,细抓征地移民,强抓技术管理,不断完善、不断提高,使建设管理的优势得到充分发挥并取得了良好成效,各项建设工作都得到了顺利推进。 The South-to--North Water Diversion(SNWD)Project is a national strategy for the grand project.in which,the middle Route Project of SNWD Project was started working from Dee.2003.Uuder the strong leadership of the State Council South-to--North water diversion office,and the support energetically of Party committees at all levels,along the project,the government and the people,the construction unit grasp project management features,closely around construction tasks,always adhere to system innovation,technology innovation,innovation of measures,to clear construction pipe structure,advanced and pragmatic construction management mode,strict integrity system,grasp the project progress,quality and safety,strict control of investment,fine grasp of resettlement,strong grasp of technology management,continuous improvement,and constantly improve,make construction management advantages into full play and have achieved good results,the construction work have been smoothly.
作者 纪明辉 李英
出处 《科技创新导报》 2012年第11期106-107,共2页 Science and Technology Innovation Herald
关键词 优势 建设管理 水利工程 南水北调 AdvantageIConstruction management water conservancy project the South--to--North Water Transfer Project
  • 相关文献

同被引文献12

引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部