3Faisal I Khan, Tahir Husain, Ramzi Hejazi. An overview and analysis of site remediation technologies[J]. Journal of Environmental Management, 2004, 71:95-122.
4Barnes D L. Estimation of operation time for soil vapor extraction systems[J]. Journal of Environmental Engineering, 2003, 129(9) : 873-878.
5Lian Zhao, Richard G Zytner. Estimation of SVE closure time[J]. Journal of Hazardous Materials, 2008, 153: 575-581.
6Maria da Conceic ao M, Alvim-Ferraz. Soil remediation time to achieve clean-up goals[J]. Chemosphere, 2006, 64 : 817-825.
7Charles S Sawyer, Madhavi Kamakoti. Optimal flow rates and well locations for soil vapor extraction design[J]. Journal of Contaminant Hydrology, 1998, 32:63-76.
8Crow W L, et al. In situ treatment of hydrocarbon contaminated soils using vapor extraction and enhanced biodegradation [R]. API publication, 1985,4410:176.
9Fall E W, Pickens W E. In-situ hydrocarbon extraction, a case study done by Converse Environmental Consultants Proceedings of the FOCUS Conference on Southwestern Ground water issues[C]. National Water Well Association, Dublin OH, 1988: 415-437.
10Thornton J C, Wootan W L. Thermal venting to recover less-volatile by drocarbons from the unsaturated zone[J]. J of Envir Sci Health, 1984, A17(1):31.