摘要
叙述了靖海电厂600 MW超临界直流机组RB的控制策略和试验情况,分析了RB试验过程中的重点和难点,并对这些问题提出了相应的解决办法。
The paper introduced the control tactic of RB test for 600 MW supercritical unit and dynamic test situation in Jinghai Power Plant, and analyzed the some keys and difficult aspects in RB control and presented countermeasures.
出处
《能源与节能》
2012年第4期77-78,82,共3页
Energy and Energy Conservation