摘要 分析了传统"拉动式"生产控制方法在造船行业应用的问题,针对造船行业项目性管理的特点,提出了"项目计划约束下的拉动式控制方法"。该方法基于企业产能具备自我调节能力的前提下,通过"强制投产"原则与看板(KANBAN)控制原理的结合,达到在制品数量控制与项目进度控制的平衡。最后,通过计算机仿真对本文的控制方法与KANBAN式生产控制方法和推动式生产控制方法进行了对比分析。 The issues of utilizing the traditional "pull--way" production control method for shipbuilding were investigated. Considering the project management character at shipbuilding, a pull--way production control method with restriction of project plan was raised. This method assumes the production capacity of the enterprise can be self--adjusted based on the progress. A "mandatory production command" controlling principle was introduced into the KANBAN control process, which can balance the WIP control and the proiect progress control target. The result of a computer simulation program was introduced at the end of the paper, which compared the result of the suggested control method with that of KANBAN control method and push production control method.
出处 《辽宁石油化工大学学报》 CAS 2012年第2期78-83,共6页 Journal of Liaoning Petrochemical University
基金 国防科工局技术基础资助项目(C172009C001)
关键词 精益生产 造船 拉动式生产 项目进度控制 Lean manufacturing Shipbuilding Pull--way production Project progress control
  • 相关文献

参考文献11

  • 1张明华,黄胜.精益造船——日本造船模式研究[J].船舶工程,2005,27(2):62-66. 被引量:34
  • 2陈强,黄胜.生产中心制造船模式的研究与应用[J].中国造船,2003,44(3):5-17. 被引量:16
  • 3门田安弘.新丰田生产方式[M].第2版.保定:河北大学出版社,2006.
  • 4Liker J K.丰田汽车案例[M].北京:中国财政经济出版社,2004.17.
  • 5Bonvik A M, Couch C E, Gershwin S B. A comparison of production-line control mechanisms[J]. International journal of production research, 1997,35(3) :789-804.
  • 6Khojasteh-Ghamari Y, Sato R. Managing an assembly production process with a proper control policy[J]. International journal of manufacturing technology and management, 2011,22 (1) : 2- 25.
  • 7Bonvik A M, Gershwin S B. Beyond kanban: Creating and analyzing lean shop floor control problems[DB/OL]. [-2011- 11 - 20]. http ://web. mit. edu/manuf- sys/www/amb, msom040496, pdf.
  • 8Buzacott J A. Queueing models of kanban and MRP controlled production systems[J]. Engineering cost and production, economics, 1989,17: 3-20.
  • 9Dallery Y, Liberopoulos G. Extended kanban control system= combining kanban and base stock[J].lie transactions, 2000,32(4) :369-386.
  • 10Ben Naylor J, Naim M M, Danny Berry. Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain[J]. J. production economics, 1999,62: 107-118.

二级参考文献9

  • 1Clark J, Lamb T. Build Strategy Development[J]. Journal of Ship Production, 1996,12(3):198.
  • 2Koenig P C, Christensen W L. Development and implementation of model work breakdown structure in naval construction: acase study[J]. Journal of Ship Production, 1999, 15(3): 1364145.
  • 3Scott J A, Todd D S, Sen P. An evolution approach to the scheduling of ship design and production process[Z].1998 Elsevier B.V. : 3514-357.
  • 4Cusumano M. A. The Japanese automobile industry:technology and management at Nissan and Toyota[M]. Cambridge, Mass.: Harvard University Press, 1991:31.
  • 5Chida, T. Davies, P. N. The Japanese shipping and shipbuilding industries: a history of their modem growth [M]. London: Athlone Press, 1990: 106.
  • 6Jeffrey K. Liker, Thomas Lamb. What is Lean Ship Construction and Repair [J]. Journal of Ship Production,2002, 18(3): 121.
  • 7Taiichi Ohno. The Toyota production system, beyond large scale production [M]. Productivity Press, Portland,Oregon, 1988.
  • 8Fujimoto, T. The evolution of a manufacturing system at Toyota [M]. N.Y: Oxford University Press, 1999.
  • 9陈强.船舶制造系统的复杂性及其控制[J].中国造船,2002,43(1):1-7. 被引量:17

共引文献48

同被引文献6

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部