分析了我厂焦化装置历年来技术改进的成效,从加热炉改造、低温热回收措施节能、设备改进以及解决生产的瓶颈问题等方面进行了全面分析。
The effect of the technical improvement of delayed coking over several years are analyzed here.The effect of furnace improvement,low-temperature heat recover for energy saving,equipment improvement and bottleneck in practice produce process are also analyzed comprehensively.