摘要
以在建的君欣时代广场工程为例,阐述了在市中心临近地铁区域的基坑施工。针对实际,介绍了基坑施工总体部署、降水措施、以及土方分段分层开挖的方案选择、控制地铁隧道变形的措施等内容,使整个基坑施工安全圆满完成。
We explain the construction about the foundation pit nearby the memo in the downtowns through the underway Junxin time square. We instruct the general layout of the foundation pit ,ground-water lowering measures ,the selection of scheme about the sequencing earthwork in layers and the procedures controlling the deformation of the subway tunnels.
出处
《工程建设与设计》
2012年第5期182-184,共3页
Construction & Design for Engineering
关键词
深基坑
土方开挖
时空效应
the deep foundation pit
the excavation of earthwork
the effect about time and space