针对施工阶段工程造价管理的特点,对施工方案、资金使用计划、设计变更、工程款支付、现在签证以及施工索赔进行严格管理,有效控制工程造价,提高投资效益,能为施工单位带来更大的效益。
According to the features of the project cost management in the construction phase,only to strictly control construction schemes,plan of the use of fund,design change,construction cost payment,visas,and construction claims were the project cost effective controled,so the benefit of investment was improved,it can bring great benefits for construction units.
出处
《大众科技》
2012年第5期78-79,共2页
Popular Science & Technology
关键词
建筑工程
施工方案
造价控制
工程索赔
Construction project
Construction project
Construction phase
Cost control
Engineering change
Construction claims