摘要
本文主要针对某型舰船体结构特点及尾轴托架安装技术要求,对不同阶段安装工艺方法进行比较,并对工序前移后存在的技术风险进行综合分析。
This paper mainly discusses the hull structure characters and the workmanship for the installation of shaft strut of a certain naval vessel, compares the methods at different stages of mounting process, and comprehensively analyzes the technical risk for moving forward the process of the shaft strut.
出处
《广东造船》
2012年第2期65-68,共4页
Guangdong shipbuilding
关键词
某型舰
尾轴托架
工序提前
船台周期
技术风险
A certain naval vessel
Shaft strut
Moving forward the process
Slipway period
Technical risk.