摘要 为了研究工作面膏体充填后对底板承压水的防治效果,需对底板破坏深度进行测试.通过单孔恒水压法对底板破坏情况进行测试,得出了采用膏体充填后完整底板最大破坏深度小于5 m,断层影响处底板最大破坏深度小于12 m.而采用垮落法开采时,由经验公式法得出的完整底板最大破坏深度为9.1 m,即采用膏体充填后完整底板的破坏深度下降了46%.该研究可为测定底板破坏深度提供参考依据. To study the control effect of confined water after paste filling on the mining face,the depth of floor failure needs to be tested.By the method of water to one drilling at constant pressure,some results were obtained as following: the maximum broken depth of complete floor with paste filling mining is less than 5 m,and the maximum broken depth of floor that was affected by fault is 12 m.However,the maximum broken depth of complete floor is 9.1 m by the empirical formula without paste filling,so the damage degree of complete floor was reduced by 46%.The study are of very important reference vaule on the broken depth of floor.
出处 《河南理工大学学报(自然科学版)》 CAS 北大核心 2012年第1期35-38,共4页 Journal of Henan Polytechnic University(Natural Science)
关键词 防治效果 单孔恒水压法 经验公式法 底板破坏深度 control effect method of water to one drilling at constant pressure empirical formula floor broken depth
  • 相关文献

参考文献8

二级参考文献18

共引文献412

同被引文献63

引证文献4

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部