摘要 以一座预应力混凝土连续刚构桥为工程背景,采用有限元软件桥梁博士建立模型,通过利用顶推力施加后墩顶位移比较和在最不利工况下应力变化的方法,证明了高温条件下合龙的可行性;通过边跨、中跨同时合龙阶段及正常使用阶段验算,证明了边、中跨同时合龙的可行性。 In the engineering background of prestressed concrete continuous rigid frame bridge,building model with the finite element software bridge,Bridge Doctor,the method that the displacement of top pier after pushing force exerted are compared with the most unfavorable conditions of stress change,proves closure feasibility under the condition of high temperature;the side span and middle span at the same time closure stage checking and the normal use stage checking proves side span and middle span at the same time closure feasibility.
出处 《公路工程》 北大核心 2012年第2期11-13,67,共4页 Highway Engineering
关键词 连续刚构桥 高温 边跨和中跨 同时合龙 Continuous rigid frame bridge High temperature Side span and middle span Closure at the same time
  • 相关文献

参考文献9

二级参考文献33

  • 1王永平,张宝银,张树仁.桥梁使用性能模糊评估专家系统[J].中国公路学报,1996,9(2):62-67. 被引量:78
  • 2许树伯.层次分析法[M].天津:天津大学出版社,1987..
  • 3交通部公路科学研究所.公路桥梁使用功能评定报告[M].北京:交通部公路科学研究所,1986..
  • 4任宝双.在用钢筋混凝土简支梁桥结构综合评估方法的研究[M].北京:清华大学土木工程系,1999..
  • 5潘黎明.大型桥梁结构安全性与耐久性综合评价研究[D].上海:同济大学,1997.
  • 6中华人民共和国交通部.JTJ073—96公路养护技术规范[M].北京:人民交通出版社,1996..
  • 7Brito J D,Branco F A,Thoft Christensen P et al. An Expert System for Concrete Bridge Management[J]. Engineering Structures, 1997,19(7) :519-526.
  • 8Hani G Melhem,Senaka Aturaliya. Bridge Condition Rating Using an Eigenvector of Priority Settings[J]. Microcomputers in Civil Engineering, 1996,11: 421-432.
  • 9姚敏,系统工程,1997年,15卷,2期
  • 10张跃,模糊数学方法及其应用,1992年

共引文献2102

同被引文献27

引证文献3

二级引证文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部