通过一个高层住宅楼的工程实例,分析了用后浇带减少高层建筑与裙房之间不设沉降缝时造成的沉降差,同时介绍了转换层的设计方法,并进行了结构计算分析,得出了一些有指导意义的结论。
According to the engineering example for the high-rise buildings,the paper analyzes the settlement difference caused by the reduction the settlement joint between high-rise buildings and skirt buildings with post-poured band,introduces the design methods of the transfer story,undertakes the structural calculation analysis,and concludes some instructive conclusion.
出处
《山西建筑》
2012年第1期37-39,共3页
Shanxi Architecture
关键词
高层住宅
沉降缝
框架剪力墙
high-rise buildings
settlement joint