摘要
介绍了陕西渭河煤化工集团的地下水预脱盐系统工艺流程,以及调试运行过程中出现的工艺及设备问题。分析了反渗透系统进水电导率、进水SDI、进水余氯及ORP、保安过滤器、产水背压等对系统的影响,并提出对策。
The technological process of the groundwater pre-desalination system of Shaanxi Weihe Coal Chemical Engineering Group, as well as the technical and equipment problems occurred in the process of debugging and running, is introduced. Meanwhile, in the reverse osmosis system, the effects of electrical conductivity,influent SDI, influent residual chlorine and ORP, security filter, produced water backpressure, etc. on the system are analyzed and discussed, and corresponding countermeasures are put forward.
出处
《工业水处理》
CAS
CSCD
北大核心
2012年第5期94-96,共3页
Industrial Water Treatment
关键词
反渗透
调试运行
脱盐
reverse osmosis
debugging and running
desalination