期刊文献+

生产竖井提升系统改造优化方案——以河南金源黄金矿业有限责任公司为例 被引量:5

Optimization of the renovation plan for an operation shaft hoisting system—With Henan Jinyuan gold mining as an example
下载PDF
导出
摘要 以金源矿业公司祁雨沟矿区主竖井提高提升能力改造为工程背景,论述了通过加大箕斗容积,更换主电动机和部分电控装置,使提升能力提高20%的竖井提升系统改造优化方案。改造工程应用表明:生产竖井提升系统改造优化方案投资少、工程量小、工期短、见效快。通过设备更新和系统改造,使竖井提升系统的安全性得到提高,有利于企业的安全生产和管理。 Taking Qiyugou mining area as an example, this paper discussed the optimization of a renovation plan for shaft hoisting system, the main objective of which is to improving the hoisting capacity by 20 % by increasing skip volume and replacing the main motor and some electrical control facilities. The modification project practice indicates that it needs less project investment, less engineering, shorter engineering period, and quicker effects. Through the equipment renewal and the system renovation, the safety of the shaft hoisting system is improved, and it is also good for the enterprises' safety production and management.
出处 《黄金》 CAS 2012年第6期36-40,共5页 Gold
关键词 竖井提升系统 生产竖井 改造 安全性 优化方案 Shaft hoisting system operating shaft modification safety optimized plan
  • 相关文献

参考文献5

  • 1<采矿设计手册>编委会.采矿设计手册(4):矿山机械卷[M]北京:中国建筑工业出版社,1988.
  • 2国家安全生产监督管理局;国家煤矿安全监察局.煤矿安全规程[M]北京:中国法制出版社,2011.
  • 3李晓飞;薛剑光.《金属非金属矿山安全规程》解读[M]武汉:长江文艺出版社,2006.
  • 4北京有色冶金设计院;鞍山黑色金属矿山设计院.金属矿山采矿设备设计[M]北京:冶金工业出版社,1977.
  • 5中华人民共和国机械工业部.JB/T 6754.2-1993直流传动矿井提升机电控设备第二部分 晶闸管电控设备[s]2-1993直流传动矿井提升机电控设备第二部分 晶闸管电控设备[K].北京:机械科学研究院,1993.

同被引文献13

引证文献5

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部