摘要
文章介绍了某电厂600MW机组四大管道支吊架的调整依据,对管道冷热态进行了检查、应力计算和调整,并对调整后的管道支吊架状态进行了评估。
The article describes adjusted basis for the 600MW power unit four pipe supports and hangers in a plant,checks the hot and cold state of piping,makes stress calculations and adjustments,and assesses the supports and hangers of the adjusted pipe.
出处
《价值工程》
2012年第16期57-57,共1页
Value Engineering
关键词
支吊架
调整
hanger
adjustment