期刊文献+

正交试验法优选平脂胶囊制备工艺 被引量:7

Preparation process of optimizing Pingzhi capsules with orthogonal test
下载PDF
导出
摘要 :目的 用正交试验研究平脂胶囊制备工艺 .方法 选择三因素三水平正交试验 ,以出膏率和芍药甙含量为指标 ,用HPL C法测定煎煮稠膏中芍药甙含量 .结果  9份试验平均出干膏率 2 3.3% ,芍药甙平均含量 0 .6 3% ,平均综合分 6 8.8,煎煮时间对工艺影响显著 (P<0 .0 5 ) ,最佳制备工艺是煎煮 2次 ,每次 2 h,加水 5倍量 .结论 双指标多因素正交试验优化的中药复方制剂制备工艺经 3批扩大 1 1 4 .8倍中试 ,重现性好 ,结果稳定 。 AIM To study the preparation process of Pingzhi capsules with orthogonal test. METHODS The content of paeoniflorin in the paste decocted is assayed with HPLC method, using orthogonal test with three factors and three levels and taking the rate of paste and the content of paeoniflorin as the standards. RESULTS The average paste rate of nine tests was 23.3%, the average content of paeoniforin in nine tests was 0.63% and the average total score was 68 8. The decocted time significantly affected preparation process ( P <0.05). The optimum extraction of Pingzhi capsules was: herbs water decocted with 5 times water, decocted two times, and two hours each time (5 mg·g -1 herbs). CONCLUSION The preparation process of complex prescription of herbs with double standard and multi factor orthogonal test has good reproduction and stability to guarantee the effects of the medicine.
出处 《第四军医大学学报》 2000年第2期235-237,共3页 Journal of the Fourth Military Medical University
关键词 平脂胶囊 中药 正交试验 高效液相色谱 pingzhi capsules medicinal herbs orthogonal test chromatography,high pressureliquid paeoniflorin
  • 相关文献

参考文献4

二级参考文献55

  • 1徐希燕,罗雨泽.企业多元化业务的选择和评估模型及其应用实例[J].经济管理,2006,32(6):63-67. 被引量:1
  • 2王寿云 科学家传记大辞典编辑组.钱学森.中国现代科学院传记[M].北京:科学出版社,1991..
  • 3Gallagher R 戴汝为 等.超越还原论.复杂性研究论文集[M].,1999..
  • 4于景元 史若华 等.财政补贴、价格、工资综合研究[M].航天工业部710所,1984..
  • 5于景元 戴汝为 等.综合集成的宏观经济智能决策支持系统[M].中国航天工业总公司710所、中国科学院自动化研究所、华中理工大学系统工程所,1996..
  • 6HorganJ.复杂性研究的发展趋势—从复杂性到困惑[J].科学美国人,1995,(10):42-47.
  • 7Mclean T, Tyson T. Standard costs, standard costing and the introduction of scientific management and new technology into the post-second world war sunderland shipbuilding industry[J]. Accounting, Business & Financial History, 2006, 16(3): 389-417.
  • 8Dossi A, Patelli L, Zoni L. The missing link between corporate performance measurement systems and chief executive officer incentive plans[J]. Journal of Accounting, Auditing & Finance, 2010, 25(4): 531-558.
  • 9Lemieux T, MacLeod W B, Parent D. Performance pay and wage inequality[J]. The Quarterly Journal of Economics, 2009, 124(1): 1-49.
  • 10Chan D W M, Chan A P C, Lam P T I, et al. An empirical survey of the motives and benefits of adopting guaranteed maximum price and target cost contracts in construction[J]. International Journal of Project Management, 2011, 29(5): 577-590.

共引文献122

同被引文献35

引证文献7

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部