建筑群下超浅埋大断面隧道开挖方案的选择 被引量:2

Excavation Scheme Selection for Large-section Super Shallow Buried Tunnel under the Buildings Complex
下载PDF
导出
摘要 青岛海底隧道团岛二路匝道与左线隧道交叉口段为变截面特大断面,隧道埋深8~21 m,隧址处工程地质复杂,地表建筑物密集,确保建筑物和施工安全至关重要。对该段隧道开挖方案的选择和采取的技术措施进行介绍。 The intersection of Qingdao Seabed Tunnel Tuandao Erlu Ramp and the left tunnel is a super large section tun- nel with buried depth of 8 - 21m, where complex geological condition is made worse by the concentrated surface building, therefore, it is of great necessity to ensure the safety of the building and construction. The paper gives an introduction of the selection of the excavation scheme and technical measures.
作者 马栋 黄立新
出处 《铁道建筑技术》 2012年第4期12-16,33,共6页 Railway Construction Technology
关键词 建筑群 超浅埋 变截面 大断面 隧道开挖 方案比选 building complex super shallow variable section large section tunnel excavation scheme selection
  • 相关文献

参考文献1

  • 1TB10204-2002.铁路隧道施工规范[S].[S].,..

共引文献164

同被引文献20

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部