Comprehensive Determination of Reinforcement Parameters for High Cut Slope Based on Intelligent Optimization and Numerical Analysis 被引量:5

Comprehensive Determination of Reinforcement Parameters for High Cut Slope Based on Intelligent Optimization and Numerical Analysis
原文传递
导出
摘要 High cut slopes have been widely formed due to excavation activities during the period of immigrant relocation in the reservoir area of the Three Gorges, China. Effective reinforcement meas-ures must be taken to guarantee the stability of the slopes and the safety of residents. This article pre-sents a comprehensive method for integrating particle swarm optimization (PSO) and support vector machines (SVMs), combined with numerical analysis, to handle the determination of appropriate rein-forcement parameters, which guarantee both slope stability and lower construction costs. The relation-ship between reinforcement parameters and slope factor of safety (FOS) and construction costs is in-vestigated by numerical analysis and SVMs, PSO is adopted to determine the best SVM performance resulting in the lowest construction costs for a given FOS. This methodology is demonstrated by a prac-tical reservoir high cut slope stabilised with anti-sliding piles, which is located at the Xingshan (兴山) County of Hubei (湖北) Province, China. The determination process of reinforcement parameters is discussed profoundly, and the pile spacing, length, and section dimension are obtained. The results pro-vide a satisfactory reinforcement design, making it possible a signficant reduction in construction costs. High cut slopes have been widely formed due to excavation activities during the period of immigrant relocation in the reservoir area of the Three Gorges, China. Effective reinforcement meas-ures must be taken to guarantee the stability of the slopes and the safety of residents. This article pre-sents a comprehensive method for integrating particle swarm optimization (PSO) and support vector machines (SVMs), combined with numerical analysis, to handle the determination of appropriate rein-forcement parameters, which guarantee both slope stability and lower construction costs. The relation-ship between reinforcement parameters and slope factor of safety (FOS) and construction costs is in-vestigated by numerical analysis and SVMs, PSO is adopted to determine the best SVM performance resulting in the lowest construction costs for a given FOS. This methodology is demonstrated by a prac-tical reservoir high cut slope stabilised with anti-sliding piles, which is located at the Xingshan (兴山) County of Hubei (湖北) Province, China. The determination process of reinforcement parameters is discussed profoundly, and the pile spacing, length, and section dimension are obtained. The results pro-vide a satisfactory reinforcement design, making it possible a signficant reduction in construction costs.
出处 《Journal of Earth Science》 SCIE CAS CSCD 2012年第2期233-242,共10页 地球科学学刊(英文版)
基金 supported by the National Natural Science Foundation of China (Nos. 40902091, 51178187) the Special Funds for Major State Basic Research Project (No. 2010CB732006)
关键词 high cut slope reinforcement parameter comprehensive determination anti-sliding pile Three Gorges. high cut slope, reinforcement parameter, comprehensive determination, anti-sliding pile, Three Gorges.