摘要
大机组供热改造后,2台及以上机组并列切换过程中,易出现1台机组真空快速降低的现象,本文主要分析了供热切换过程中机组真空快速降低的原因及空气来源,然后依据此原因制定了供热备用期间及投停过程中的防范措施。
After the improvement of large unit to supply heat,in the switching process of two or more units by juxtaposed load,appear a rapid reduction of unit vacuum,this paper mainly analyzed the reason of unit vacuum rapid decrease in the process of switching heating load and the air source,and then on the basis of this reason,developed preventive measures during heating load standby and being on or off.
关键词
大机组
供热改造
供热切换
运行事件
原因分析
防范措施
large unit
improvement of supply heating
switch load
operation event
cause analysis
preventive measures.