摘要
建设工程造价是指进行一项工程建设所需的全部费用,而建设工程造价全过程控制就是在工程投资决策阶段、设计阶段、施工阶段、竣工阶段把建设工程造价控制在批准造价限额以内,防止"三超"现象的发生,更好地利用人力、物力、财力,以取得较好的社会效益和投资效益。
Construction cost refers to the full cost that invests in a project,and the control of engineering cost is to ensure the engineering cost on the phases of investment and decision,design,construction,and completion in consistence with that of the initial one,avoid the incidence of "Three Excesses" and make good use of human,material and financial resources for the benefit of society and investment.
出处
《企业科技与发展》
2012年第6期86-87,90,共3页
Sci-Tech & Development of Enterprise
关键词
煤炭企业建设
工程造价管理
控制
construction of coal enterprise
management of engineering cost
control