期刊文献+

相序优化模糊控制在智能交通中的应用研究

Application research on fuzzy control based on phase sequence optimization in intelligent transportation
下载PDF
导出
摘要 根据平面交叉路口的智能交通信号控制原理,建立了一个交叉路口的交通流量模型,提出一种基于相序优化模糊控制的交通控制方法,以PCU(小客车当量)平均延误时间为控制目标实施控制。仿真结果表明,这种控制方法能使交叉路口的PCU平均延误时间明显减小,取得了较好的控制效果。 Depending on intelligent transportation control theories of multiphase intersection, a traffic flow model of intersection is constructed. A fuzzy traffic control system based on phase sequence optimization is put forward, which aims at controlling the average delay time of PUC. The simulation experiments indicate that the system can decrease average delay time of PUC and get a better control result.
作者 林涛 张可儿
出处 《传感器世界》 2012年第5期27-31,共5页 Sensor World
关键词 交通控制 模糊控制 相序优化 交叉路口 traffic control fuzzy control phase sequenceoptimization intersection
  • 相关文献

参考文献4

二级参考文献34

  • 1杨晓光,林瑜,杭明升.信号控制交叉口公共汽车优先信号确定方法研究[J].中国公路学报,2001,14(z1):101-104. 被引量:49
  • 2张卫华,陆化普,石琴,刘强.公交优先的信号交叉口配时优化方法[J].交通运输工程学报,2004,4(3):49-53. 被引量:79
  • 3Jayakrishnan R, Wei K Tsai,Jun-Seok Oh et al. Event-Based ATIS: practical implementation and evaluation of optimized strategies (Part Ⅱ). 1999. PRR2001-1.
  • 4Jayakrishnan R, Jun-Seok Oh, Abd-El-Kader Sahraoui. Calibration and path dynamics issues in microscopic simulation for advanced traffic management and information systems. Transportation Research Record 1771, 2001. 9~17.
  • 5Haight Frank A. Evaluation of projects and programmes.: principles and examples. in Project and Policy Evaluation in Transport, Aldershot, Hampsire,England, 2002. 181~208.
  • 6Logi, Filippo, Stephen G Ritchie. Development and evaluation of a knowledge-based system for traffic congestion management and control. Transportation Research, December 2001,9C (6) :433~459
  • 7McNally, Michael G. The activity-based approach.Handbook of Transport Modelling, 2000. 53~69.
  • 8Liu Henry X, Jun-Seok Oh, Will Recker. Adaptive signal control system with on-line performance measure for single intersection,2002. PWP-2002-5.
  • 9Ritchie Stephen G, Ruey L Cheu. Neural network models for automated detection of Non-recurring congestion. 1993. PRR-93-5.
  • 10McNally Michael G, James E Moore Ⅱ, C Arthur MacCarley et al. Evaluation of the anaheim advanced traffic control system field operational test: final report task B.. Assessment of Institutional Issues.1999. PRR-99-27.

共引文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部