摘要
常州紫荆公园大跨指环景观塔结构在拼装过程中因体系和荷载不断变化,施工过程中结构的安全性和稳定性成为了成功安装的关键。本文阐述了结构安装过程的质量监控措施,可为该类结构安装提供参考。
The configuration and load is changing continuously in Installing the ring type fenis wheels for changzhou zhijin park. Get the Structure safety and stability is the sixty-four-dollar question.The quality monitoring for the construction course get the practicable referrence in analogous construction.
出处
《工程建设与设计》
2012年第6期159-161,共3页
Construction & Design for Engineering
关键词
指环结构
质量监控
位移
应力
ring type structure
qualitymonitoring
displacement
stress