桥梁翼板横向改道通车顶撑加固施工技术探讨

Discussion on Top Bracing Reinforcing Construction Technology of Diverted Traffic of Bridge Wing Slab
下载PDF
导出
摘要 因赣江南大道下穿桥施工,南昌大桥西引桥需改道通车。车辆改道行驶后将改变南昌大桥翼缘板受力模式。为了确保南昌大桥结构安全,必须对南昌大桥翼板进行加固。对此,采用钢桁架进行顶撑加固施工。该文介绍了南昌大桥梁板加固施工技术,可供同行参考。 The west approach bridge of Nanchang Bridge is required for the diverted traffic according to the construction requirements of Ganjiangnan Avenue Underpass Bridge. The diverted driving of vehicle will change the stress mode of wing slab of Nanchang Bridge. In order to ensure the structural security of Nanchang Bridge, it must be to reinforce the wing slab of Nanchang Bridge. Therefore, the steel truss is used for the top bracing reinforcement construction. The article introduces the beam slab reinforcement construction technology of Nanchang Bridge able to be referred for the similar projects.
作者 李志为
出处 《城市道桥与防洪》 2012年第5期152-156,13,共5页 Urban Roads Bridges & Flood Control
关键词 下穿桥 交通改道 翼缘板受力 钢构满堂支架 翼板加固 南昌大桥 underpass bridge,diverted traffic,stress of wing slab,full-supported steel frame,reinforcement of wing slab
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部