摘要
针对H航市政工程仔细研究合同,找准突破口,把变更方向确定为通过各类措施增加土方工程量和尽量争取合同内专业分包转为项目部实施为目标。
Aimed at H municipal engineering, the contract was carefully studied, found breakthrough, change direction was determined, that is through a variety of measures to increase the volume of earthwork and convert professional package into the project implementation in the contract.
出处
《大众科技》
2012年第6期91-92,共2页
Popular Science & Technology
关键词
土方开挖
回填
基底换填
earth excavation
backfill
base replacement