施工段接槎处应做剔凿处理,并用气泵清理干净,尤其是靠近摸板的接槎处,不得留有混凝土渣子。浇水湿润后浇筑混凝土,保证接槎严密。
The joint place of construction section should do the tick chisel processing, and cleaned-up it clean with air pump, especially the joint place near the formwork, shall not leave the concrete scum. after watering it wet and pouring concrete,so ensure the tight joint.