摘要
班扎水电站工程是中国水电顾问集团华东勘测设计研究院在越南承接的一个从设计到施工阶段咨询的全过程的水电项目,坝址区工程地质条件复杂。在施工过程中,在河床及左岸坝段揭露出一条新的大断层带(Ⅵ-19)。通过现场工程咨询,在分析大断层带工程地质条件的基础上,提出了相应的处理措施,满足了设计要求,对于类似工程具有借鉴作用。
The Vietnam's Ban Chat Hydropower Station project is consulted by HydroChina Huadong Engineering Corporation from the stages of design to construction. The dam site engineering geological conditions are comphcated. A large fault VI-19 is newly revealed in the location of riverbed and left dam section during the construction. Appropriate measures to treat this fault are proposed on the basis of geological condition survey. The treatment meets the requirements of design and can be as references to similar projects.
出处
《水力发电》
北大核心
2012年第6期19-21,共3页
Water Power
关键词
坝基
地质条件
大断层
处理措施
班扎水电站
dam foundation
geological condition
large fault
treatment measure
Ban Chat Hydropower Station