期刊文献+

班扎水电站坝基大断层带的综合处理

Comprehensive Treatment of the Large Fault Belt in Dam Foundation of Ban Chat Hydropower Station
下载PDF
导出
摘要 班扎水电站工程是中国水电顾问集团华东勘测设计研究院在越南承接的一个从设计到施工阶段咨询的全过程的水电项目,坝址区工程地质条件复杂。在施工过程中,在河床及左岸坝段揭露出一条新的大断层带(Ⅵ-19)。通过现场工程咨询,在分析大断层带工程地质条件的基础上,提出了相应的处理措施,满足了设计要求,对于类似工程具有借鉴作用。 The Vietnam's Ban Chat Hydropower Station project is consulted by HydroChina Huadong Engineering Corporation from the stages of design to construction. The dam site engineering geological conditions are comphcated. A large fault VI-19 is newly revealed in the location of riverbed and left dam section during the construction. Appropriate measures to treat this fault are proposed on the basis of geological condition survey. The treatment meets the requirements of design and can be as references to similar projects.
作者 林金洪
出处 《水力发电》 北大核心 2012年第6期19-21,共3页 Water Power
关键词 坝基 地质条件 大断层 处理措施 班扎水电站 dam foundation geological condition large fault treatment measure Ban Chat Hydropower Station
  • 相关文献

参考文献3

  • 1GB50487-2008水利水电工程勘察规范[S].
  • 2TCXD 80:2002越南社会主义共和国施工标准[S].
  • 340/2009/TF-BXD越南社会主义共和国建设工作中应用国外建设标准的规定[S].

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部